STATE OF OREGON DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS Bids due January 13, 2022 @ 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 13th day of January, 2022. Bid Opening will be at the Oregon Department of Transportation, 3930 Fairview Industrial Drive SE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager at the following time and places: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to ODOT’s address below. — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Office Bid Box located at the following address: ODOT Procurement Office – Construction Contracts Unit, MS# 2 2 3930 Fairview Industrial Drive SE, Salem, Oregon 97302 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. This requirement will be strictly enforced. Prequalification must be in the class(es) of work that is indicated in the project’s special provisions, and the bid booklet. The Agency will reject bids from bidders who are not prequalified for the class of work indicated. The Prequalification Application form and instructions are published on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx To view and download plans, specifications, and bid booklets PLEASE visit the Agency’s Electronic Bidding Information System (eBIDS) website at https://ecmnet.odot.state.or.us/ebidse The eBIDS site allows free access to plans and special provisions, up-to-date bidding information, and each project holders of plans. All project addenda and clarification letters are published on the Agency’s website https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 1. YAMHILL COUNTY: OR153: Salt Creek (Ash Swale) Bridge Project on the Bellevue Hopewell Highway (Rt. No. OR153) in Amity. FAP No. S153(008). ($5,000,000 – $10,000,000). Req. approx. 1,620 hrs train.; 700 ft2 temp. signs; 4 ea PCMS; 160 hrs flag.; const. & rem. temp. acc. rd.; temp. wrk. br.; temp. wrk. acc. & contain.; 270 yd2 matting; 21 ea chk. dam; 589 ft comp. fltr. berm; 102 ft sed. fence; 500 ft sed. barr.; turb. mntr.; const. surv. wrk.; 3,516 yd3 exc.; 803 yd3 st. emb.; 2,440 yd2 subg. stab.; 3,213 yd2 geot.; 789 yd3 riprap; 249 ft pipe; 116 ft2 pv. end slp.; 50 yd2 trnch. resurf.; br. rem. wrk.; 1,534 yd3 str. exc.; 1,370 yd3 gran. str. backfill; furn. drill. equip.; 295 yd3 drill. shft. conc.; 90,000 lb drill. shft. reinf.; 2,266 ft CSL tubes; 6 ea CSL tests; 507 ft drill. shft. exc.; 216 ft perm. shft. cas.; furn. pile drv. equip.; 2,706 ft furn. stl. piles; 32 ea drv. stl. piles; 271,812 lb reinf.; 476 yd3 deck conc.; 572 yd3 gen. str. conc.; 1,971 yd3 saw cut text.; 293 yd2 reinf. conc. br. end pan.; 649,679 lb str. stl.; 4 ea br. drains; 24 ea bear. dev.; 87 ft strip seals; 951 ft 3 tube stl. rl.; 95 ft fence; 170 ft dr. stl. pil.; 490 yd2 CPPR; 2,130 ton aggr. base; 1,030 ton ACP; 7 ea asph. appr.; 109 ft conc. curb; 175 ft gd. rl.; 4,261 ft paint striping; 0.72 yd3 conc. in sign sup.; 627 lb stl. in sign sup.; 85 ft2 signs; 2.3 acres seeding; 93 yd3 topsoil; 2,590 ea plants; 13 yd3 comp. mulch. Completion Time: September 30, 2023. Class of Work: Bridges and Structures. THIS PROJECT CONTAINS FUEL ESCALATION CLAUSE. THIS PROJECT CONTAINS A 4% DBE GOAL. THIS PROJECT CONTAINS A 10% INDIAN EMPLOYMENT PREFERENCE GOAL. PROJECT MANAGER: VIDAL T. FRANCIS, EMAIL: VIDAL.T.FRANCIS@ODOT.STATE.OR.US The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. STATE OF OREGON BY AND THROUGH ITS DEPARTMENT OF TRANSPORTATION Notice 22001 – January 13, 5 – week ad Published December 10, 2021. BT225228
ad: 225228
Publication: Construction 2
Section: Legals
Start Date: 2021/12/10
End Date: 2021/12/10
Owner: ODOT Procurement
City: SALEM
County: Multnomah
Bid Date: 01/13/22
Bid Time: 9:00 AM