STATE OF OREGON DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS Bids due: October 19, 2023 @ 9:00 AM Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 19th day of October, 2023. Bid Opening will be at the Oregon Department of Transportation, 355 Capitol Street NE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. Bids will be received by Marie Wright, Construction Contracts Manager. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to the following address: Oregon Department of Transportation Procurement Construction Contracts, MS #5-1 355 Capitol Street NE, Salem, Oregon 97301 — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project’s special provisions, and the bid booklet. The Prequalification Application form, requirements and instructions are on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx The Agency’s Electronic Bidding Information System (eBIDS) allows free access to plans, specifications, bid booklets, project addenda, and clarification letters at https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 1. GILLIAM COUNTY: OR206: Rock Creek Bridge Project on the Wasco-Heppner Highway (Rt. No. OR206) near Condon. FAP No. S300(003). ($2,000,000 – $5,000,000). Req. approx. 600 hrs training; 870 ft2 temp. signs; 8 ea PCMS; 400 hrs flag.; 2 ea flag. sta. light.; 3,131 ft stripe rem.; 700 ft temp. gd. rl.; 1 ea port. traf. sig.; constr. & rem. temp. rdbd. & surf.; temp. wtr. mgmt. fac.; 855 yd2 matting; 1,940 yd2 comp. eros. blnkt.; 550 ft sed. fence; 334 ea sed. barr.; 22.5 ton contam. soil disp.; const. surv. wrk.; 5,246 yd3 exc.; 524 yd3 st. emb.; 560 ft per. ctrl. blst. holes; 4,465 yd2 geot.; 802 yd3 riprap; 55 ft vid. insp.; 121 ft pipe; 2 ea sl. end sect.; 70 ft2 pav. culv. end sl.; 393 ft drain. curb; wrk. contain. plan; br. rem. wrk.; 400 yd3 str. exc.; 480 yd3 gran. str. bkfl.; 18 yd3 drill. shft. conc.; 4000 lb drill. shft. reinf.; 304 ft CSL test acc.; 18 ea CSL test; 76 ft drill. shft. exc.; 25,500 lb reinf.; 147 yd3 gen. str. conc.; 14 yd3 UHPC; 750 ft prestr. gird.; 12 ea bear. dev.; 255 ft curb mt. rail; 3,972 ft2 poly. memb.; 284 yd2 CPPR; 2,307 ton aggr. base; 1,058 ton ACP; 712.5 ft gd. rl.; 62.5 ft conc. barr.; 10,794 ft hi-build paint; 0.4 yd3 conc. in sign sup.; 304 lb st. in sign sup.; 26 ft2 signs; 2 ea wtr. qual. sw.; 0.7 acre wd. ctrl.; 1 ea seed. mob.; 0.7 acre seeding; 40 ea trees; 92 ea tub. plant; 120 ea plant cut.; 638 ft fence; streambed en-hance. Completion Time: November 15, 2024. Classes of Work: A) Earthwork and Drainage, or B) Bridges and Structures. THIS PROJECT CONTAINS A 7% DBE GOAL. THIS PROJECT CON-TAINS A 2% INDIAN EMPLOYMENT PREFERENCE GOAL. PROJECT MANAGER: RILEY SKOV, EMAIL: DALLESCONSTRUCTION@ODOT.OREGON.GOV 2. CLATSOP COUNTY: US26: Little Humbug Creek Bridge Project on the Sunset Highway (Rt. No. US26) near Cannon Beach. FAP No. S047(119). ($2,000,000 – $5,000,000). Req. approx. 550 hr train-ing; 610 ft2 temp sign; 8 ea PCMS; 6,261 hr flag; 4 ea flag sta light; 51 ea TCS; 2 ea AFAD; 1,000 ea temp refl pvmt marker; 16,000 ft temp stripe; 2,217 ft temp barr; 8 ea impact atten; 125 ea refl barr panel; temp water manage facility ( 40 yd2 plastic sheet; 150 ea sandbag); 250 yd2 plastic sheet; 450 yd2 matting; 730 yd2 comp ero blanket; erosion/sediment cntrl mngmt; 4 ea const ent; 625 ft sed fence; 1,220 ft sed barr; const surv work; 875 ft asph saw cut; 2,010 yd3 gen exc; 410 yd2 36 subg stab; 830 yd2 geotext; 20 yd3 riprap; 2 ea riprap basin; 123 ft vid insp; 402 ft pipe; 225 ft drain curb; br removal; shor
ad: 302695
Publication: Construction 2
Section: Legals
Start Date: 2023/09/29
End Date: 2023/09/29
Owner: Oregon Department of Transportation
City: SALEM
County: Multnomah
Bid Date: 10/19/23
Bid Time: 9:00 AM