NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS Bids due: February 18, 2021 at 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 18th day of February, 2021. Bid Opening will be at the Oregon Department of Transportation, 3930 Fairview Industrial Drive SE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager at the following time and places: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to ODOT’s address below. — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Office Bid Box located at the following address: ODOT Procurement Office – Construction Contracts Unit, MS# 2 2 3930 Fairview Industrial Drive SE, Salem, Oregon 97302 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. This requirement will be strictly enforced. Prequalification must be in the class(es) of work that is indicated in the project’s special provisions, and the bid booklet. The Agency will reject bids from bidders who are not prequalified for the class of work indicated. The Prequalification Application form and instructions are published on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx A $200.00 FILING FEE must accompany the Prequalification Application. For further information, call 503-986-2710. To view and download plans, specifications, and bid booklets PLEASE visit the Agency’s Electronic Bidding Information System (eBIDS) website at https://ecm.odot.state.or.us/cf/EBIDS/ The eBIDS site allows free access to plans and special provisions, up-to-date bidding information, and each project holders of plans. All project addenda and clarification letters are published on the Agency’s website https://ecm.odot.state.or.us/cf/EBIDS/ Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 1. WASHINGTON COUNTY: Cedar Creek/Tonquin Trail: OR99W – SW Pine St (Sherwood) Project on the Pacific Highway West (Rt. No. OR99W) in Sherwood. FAP No. 6710(005). ($2,000,000 – $5,000,000). Req. approx. 660 hr training; 844 ft2 temp. signs; 2 ea. PCMS; 20 ea. TCS; 5,039 yd2 matting; 6,432 ft sed. fence; 74 ton contam. soil disp.; const. surv. work; 2,654 yd3 emb.; 987 yd3 stone emb.; 5,916 ft2 anchored mesh wall soil slope stabilization; 1,511 ft drain pipe; 265 ft culv. pipe; 285.7 ft storm sew. pipe; 40 ft str. plate arch; 47 yd3 str. plate conc. footings & headwalls; 10,340 ft2 reinf. soil slope walls; 912 ft2 MSE retain. wall; soil nail retaining walls; 8,300 lbs reinf.; 18 yd3 gen. str. conc.; 718 ft auger-cast (CFA) piles; prefab. bridge; 262 ft. timber boardwalk; 1,112 yd3 agg. base; 1,026 ton ACP; 721 ft conc. curbs; 1,103 ft2 conc. walks; 12 ea. curb ramps; 97 ft2 signs; traffic sig. mod.; water qual. str.; 1.2 ac. seeding; 840 yd3 topsoil; 15 ea. trees; 3,500 ea. plants; 272 ft CL fence; 303 yd3 streambed exc.; 21 yd3 streambed boulders & cobbles; 1,728 ft split rail fence. Completion Time: December 6, 2021. Classes of Work: Either: A) Earthwork and Drainage, or B) Bridges and Structures. THIS PROJECT CONTAINS A 8% DBE GOAL. PROJECT MANAGER: ROB WATTMAN, EMAIL: ROBERT.K.WATTMAN@ODOT.STATE.OR.US The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. STATE OF OREGON BY AND THROUGH ITS DEPARTMENT OF TRANSPORTATION Notice 21005 – February 18, 3 – week ad Published January 29, 2021. BT191074

ad: 191074

Publication: Construction 2

Section: Legals

Start Date: 2021/01/29

End Date: 2021/01/29

Owner: ODOT Procurement

City: SALEM

County: Multnomah

Bid Date: 02/18/21

Bid Time: 9:00 AM