NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS Bids due: August 26, 2021 @ 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 26th day of August, 2021. Bid Opening will be at the Oregon Department of Transportation, 3930 Fairview Industrial Drive SE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager at the following time and places: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to ODOT’s address below. — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Office Bid Box located at the following address: ODOT Procurement Office – Construction Contracts Unit, MS# 2 2 3930 Fairview Industrial Drive SE, Salem, Oregon 97302 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. This requirement will be strictly enforced. Prequalification must be in the class(es) of work that is indicated in the project’s special provisions, and the bid booklet. The Agency will reject bids from bidders who are not prequalified for the class of work indicated. The Prequalification Application form and instructions are published on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx To view and download plans, specifications, and bid booklets PLEASE visit the Agency’s Electronic Bidding Information System (eBIDS) website at https://ecmnet.odot.state.or.us/ebidse The eBIDS site allows free access to plans and special provisions, up-to-date bidding information, and each project holders of plans. All project addenda and clarification letters are published on the Agency’s website https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 1. WASHINGTON COUNTY: OR217: OR10 – OR99W Section of the Beaverton-Tigard Highway (Rt. No. OR217) in Beaverton. FAP No. S144(026). (Over $ 30,000,000). Req. approx. 14,400 hr training; 11,600 ft2 temp signs; 11 ea. PCMS; 2,300 hr flaggers; 1,400 ea. TCS; 90,475 ft temp barr.; const. & rem. temp surf.; 326,300 yd2 matting; 156,625 yd2 compost erosion blanket; 84,476 ft. sed. barr.; 4,000 ton contam. soil disp.; 50,000 gal contam. groundwater rem.; seg. & stockpile contam. shldr. soil; temp. ped. br.; const. surv. work; 167,686 yd3 gen. exc.; 40,221 yd2 subg. stab.; 8,172 ft drn. pipe; 15,875 ft storm sewer pipe; 1,315 ft D.I. pipe; 78 ea conc. mnhls.; 167 ea conc. inlets; 2,347 yd2 trench resurf.; temp. work access & contain.; br. rem. work; 63 yd2 cl. 2 prep.; 3,755 yd3 str. exc.; 209 yd3 gran. wall bkfl.; 1,519 yd3 gran. str. bkfl.; 898 yd3 drilled shaft conc.; 242,930 lb drilled shaft reinf.; 840 ft drilled shaft exc.; 24 ea. micropiles; 5,530 ft furn. stl. piles; 89 ea. drv. stl. piles; 799,468 lb reinf; 18,649 lb coated reinf.; 255 yd3 found. conc.; 970 yd3 deck conc.; 2,185 yd3 gen. str. conc.; 25,927 yd2 arch. treat.; 1,048 yd2 reinf. conc. br. end panel; 640 ft PCPS slabs; 1,890 ft PCPS box beams; 11,317 yd2 furn. & const. MPCO mat.; 47 yd3 furn. PPC; 738 yd2 const. PPC; 170 yd3 SCO mat.; 3,200 yd2 const. SCO; 535,000 lb stl. plate girder; 5,695 ft br. rl.; 3,744 ft2 MSE retain wall; 2,785 ft2 CIP conc. rigid grav. retaining wall; 461 yd3 foundation conc.; 138 ea. anchors; 3,682 ft foundation exc.; 3,790 ft furn. & install stl. soldier piles; 4,254 ft soil nails; 585 yd2 CIP str. facing; 585 yd2 shotcrete constr. facing; 108,064 ft2 sound walls; 2,240 ft protect. fence; 6 ea. walkway platforms; 238,880 yd2 cold pln. pvmt. rem.; 101,241 ton agg. base; 99,041 ton ACP; 2,377 ton PG 64-22; 3,504 ton PG 70-22ER; 9,228 ft conc. curbs; 21,079 ft2 conc. walks; 38 ea. curb ramps; 22,338.5 ft gd. rl.; 11,975 ft conc. barr.; 3 ea. med. obst. barr.; 10.85 mi. rumble strips; 26,600 ft thermos. striping; 168,600 ft MMA striping; 8,937 ft2 signs; switching, conduit, wiring; lighting poles & arms; fiber relocation; 13 ea. elect. syst. install.; 3 ea. traffic sig. install.; 6 ea. traffic sig. mod.; 7 ea. ramp meter install.; 11 ea. monotube cant. sign str.; 3 ea. storage ponds; 3 ea. bioretention ponds; 12 ea. water quality swale; 4 ea. bioslope; 45.12 ac. seeding; 147 ft D.I. pipe w/ restrain. jts. & cl. B bckfill.; 228 ft D.I. pipe w/ restrain. jts. on str.; 88 ft stl. pipe casing. This project requires Railroad Insurance. Completion Time: October 31, 2025. Classes of Work: Either: A) Bridges and Structures, or B) the combination of 1) Asphalt Concrete Paving and Oiling & 2) Earthwork and Drainage. THIS PROJECT CONTAINS ASPHALT AND FUEL ESCALATION CLAUSES. THIS PROJECT CONTAINS A 13% DBE GOAL. THIS PROJECT CONTAINS A 4% INDIAN EMPLOYMENT PREFERENCE GOAL. A VIRTUAL MANDATORY PREBID MEETING WILL BE HELD AT 9:00 A.M. ON WEDNESDAY, JULY 21, 2021. THE LINK FOR THE ONLINE MEETING WILL BE POSTED ON THE PRE-BID AGENDA, POSTED TO ODOT EBIDS WEBSITE, UNDER BID REFERENCE DOCUMENTS. PROJECT MANAGER: RICHARD SMITH, EMAIL: RICHARD.SMITH@ODOT.STATE.OR.US The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. STATE OF OREGON BY AND THROUGH ITS DEPARTMENT OF TRANSPORTATION Notice 21027 – August 26, 7 – week ad Published July 9, 2021. BT208496

ad: 208496

Publication: Construction 2

Section: Legals

Start Date: 2021/07/09

End Date: 2021/07/09

Owner: ODOT Procurement

City: SALEM

County: Multnomah

Bid Date: 08/26/21

Bid Time: 9:00 AM