SUPPLEMENTAL NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL NOTICE TO CONTRACTORS Bids due: March 24, 2022 @ 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 24th day of March, 2022. Bid Opening will be at the Oregon Department of Transportation, 3930 Fairview Industrial Drive SE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager at the following time and places: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to ODOT’s address below. — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Office Bid Box located at the following address: ODOT Procurement Office – Construction Contracts Unit, MS# 2 2 3930 Fairview Industrial Drive SE, Salem, Oregon 97302 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. This requirement will be strictly enforced. Prequalification must be in the class(es) of work that is indicated in the project’s special provisions, and the bid booklet. The Agency will reject bids from bidders who are not prequalified for the class of work indicated. The Prequalification Application form and instructions are published on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx To view and download plans, specifications, and bid booklets PLEASE visit the Agency’s Electronic Bidding Information System (eBIDS) website at https://ecmnet.odot.state.or.us/ebidse The eBIDS site allows free access to plans and special provisions, up-to-date bidding information, and each project holders of plans. All project addenda and clarification letters are published on the Agency’s website https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 4. SHERMAN AND WASCO COUNTIES: Central Oregon Curb Ramps Phase 1 on Various Highways in The Dalles, Maupin, and Wasco. FAP No. SA00(442). ($1,000,000 – $2,000,000). Req. approx. 300 hr training; 835 ft2 temp signs; 840 ft PCD; 61 ea. temp. curb. ramp; 2,310 ft2 temp. walks; const. surv. work; 2,980 ft asph. pvmt. saw cut.; 1,202 yd3 gen. exc.; 25 ft storm sew. pipe; 24 ea. adj. inlets; 1,328 ton agg base; 332 ton ACP; 3,393 ft conc. curbs; 17,916 ft2 conc. walks; 2.5 yd3 conc. stairs; 79 ea. curb ramps; 997 ft2 trunc. domes; 1,007 ft2 unit pavers; 452 ft2 conc walk w/raised edge; 731 ft2 pvmt. bar; 1,800 lbs PSST sign sup.; 6 ft2 signs; 40 tons rock mulch; 116 ft metal handrail. Completion Time: November 17, 2022. Class of Work: Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS A 3% DBE GOAL. PROJECT MANAGER: WADE LUCKMAN, EMAIL: WADE.LUCKMAN@ODOT.OREGON.GOV 5. WALLOWA COUNTY: OR82 Curb Ramps (Wallowa/Lostine) Project on the Wallowa Lake Highway (Rt. No. OR82) in Wallowa and Lostine. FAP No. S010(054). ($2,000,000 – $5,000,000). Req. approx. 450 hr training; 1,200 ft2 temp sign; 600 hr flag; 400 ft PCD; 52 ea inlet protect; 100 ft sed barr; 683 ton contam soil disp; const surv work; 6,500 yd2 rem curb ramp, walk, curb, surf; 3,300 ft asph saw cut; 220 ft vid insp; 448 ft pipe; 11 ea conc manhole; 14 ea conc inlet; 3 ea fill abandon struct; 97 yd2 trench resurf; 2,100 ton aggr base; 380 ton comm ACP; 71 yd2 ACP repair; 3,960 ft curb; 1,300 ft2 conc driveway; 25,000 ft2 conc walk; 6,100 ft2 patterned conc surf; 88 ea curb ramp; 1,200 ft2 trunc dome; 17,000 ft pvmt marking high perform; 6 ea crosswalk close; 238 fbm wood sign post; 2,750 lb PSST; 286 ft2 sign; luminaire, lamp, ballast; flash beacon install; 26 yd3 topsoil; 310 yd3 sod lawn; 280 ton rock mulch; 10 ea boulder; 7,400 ft2 geotextile; 79 ft fence. Completion Time: October 31, 2022. Classes of Work: Earthwork and Drainage or Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS A 5% DBE GOAL. THIS PROJECT CONTAINS A 25% INDIAN EMPLOYMENT PREFERENCE GOAL. PROJECT MANAGER: BRYAN STRASSER, EMAIL: BRYAN.E.STRASSER@ODOT.OREGON.GOV 6. BAKER COUNTY: OR7/I-84/US30 Curb Ramps (Baker City) Project on the Various Highway (Rt. No. OR7/I-84/US30) in Baker City. FAP No. SA00(457). ($5,000,000 – $10,000,000). Req. approx. 1,590 hr train.; 3,545 ft2 temp. signs; 7 ea seq. arr. signs; 4 ea PCMS; 1,360 hr flag.; 1,296 ft temp. striping; 2,520 ft PCD; 30 ea temp. curb ramp; 4,920 ft2 temp. walks; 236 ea inlet prot.; 27 ton contam. soil disp.; 5 ea soil smpl. coll. & test.; const. surv. wrk.; 1,090 yd2 rem. walks & drvwys.; 6,777 yd2 rem. surf.; 11,243 yd2 rem. curb ramp, walk, curb, surf.; 16,214 ft asph. pvmt. saw cut.; 211 yd2 sub. stab.; 1,286 ft vid. inspect.; 1,321 ft pipe; 71 ea conc. inlet; 75 ea adj. box.; 49 ea adj. inlets; 7 ea adj. M.H.; 440 yd2 trnch. resurf.; 38 ea pothole ver.; 192 ft2 retain. wall; 1,887 ton aggr. base; 1,759 ton CACP; 683 ft2 asph. walks; 8,090 ft2 asph. sl. pav.; 844 yd2 pl. conc. pvmt.; 18,395 ft conc. curbs; 441 ft2 conc. isld.; 8,039 ft2 conc. drvwy.; 93,059 ft2 conc. walks; 360 ft2 conc. surf.; 324 ea curb ramps; 4,332 ft2 trunc. domes; 150 ft pl. comp. striping; 10,200 ft2 pvmt. bar; 24 ea xwalk clos. sup.; 126 fbm wood sign post; 13 yd3 conc. in sign sup.; 11,630 lbs st. in sign sup.; 730 ft2 signs; pl. found.; switch., cond., & wir.; refurb. & reinstall. extg. illum. sys.; 7 ea traf. sig. mod.; 3 ea flash. beac. install.; 38 yd3 topsoil; 1,412 yd2 sod lawn; 13 yd3 bark mulch; 34 yd3 cinder mulch; 429 ton rock mulch; 22 ft handrail; 15 ea reset. extg. hydrants. Completion Time: November 18, 2022. Classes of Work: Either: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS A 4% DBE GOAL. THIS PROJECT CONTAINS A 10% INDIAN EMPLOYMENT PREFERENCE GOAL. PROJECT MANAGER: BRYAN STRASSER, EMAIL: BRYAN.E.STRASSER@ODOT.OREGON.GOV The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. STATE OF OREGON BY AND THROUGH ITS DEPARTMENT OF TRANSPORTATION Notice 22016 – March 24, 3 – week ad Published March 4, 2022. BT234446

ad: 234446

Publication: Construction 2

Section: Legals

Start Date: 2022/03/04

End Date: 2022/03/04

Owner: ODOT Procurement Office

City: SALEM

County: Multnomah

Bid Date: 03/24/22

Bid Time: 9:00 AM