SUPPLEMENTAL NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL NOTICE TO CONTRACTORS Bids due: April 7, 2022 @ 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 7th day of April, 2022. Bid Opening will be at the Oregon Department of Transportation, 3930 Fairview Industrial Drive SE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager at the following time and places: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to ODOT’s address below. — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Office Bid Box located at the following address: ODOT Procurement Office – Construction Contracts Unit, MS# 2 2 3930 Fairview Industrial Drive SE, Salem, Oregon 97302 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. This requirement will be strictly enforced. Prequalification must be in the class(es) of work that is indicated in the project’s special provisions, and the bid booklet. The Agency will reject bids from bidders who are not prequalified for the class of work indicated. The Prequalification Application form and instructions are published on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx To view and download plans, specifications, and bid booklets PLEASE visit the Agency’s Electronic Bidding Information System (eBIDS) website at https://ecmnet.odot.state.or.us/ebidse The eBIDS site allows free access to plans and special provisions, up-to-date bidding information, and each project holders of plans. All project addenda and clarification letters are published on the Agency’s website https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 2. VARIOUS COUNTIES: Central Oregon Curb Ramps Phase 2 Project on Various Highways (Rt. No. US97 & OR206) beginning in Moro. FAP No. SA00(434). ($2,000,000 – $5,000,000). Req. approx. 750 hrs train.; 1,755 ft2 temp. signs; 1,780 ft PCD; 78 ea temp. curb ramps; 2,400 ft2 temp. walks; const. surv. wrk.; 8,466 ft asph. pvmt. saw cut.; 3,897 yd3 exc.; 786 yd2 geot.; 595 ft vid. inspect.; 336 ft pipe; 3 ea conc. M.H.; 15 ea conc. inlet; 36 ea adj. box.; 25 ea adj. inlet; 4 ea adj. M.H.; 105 yd2 trnch. resurf.; 545 yd2 CPPR; 4,345 ton aggr. base; 17 ton aggr. shldr.; 1,388 ton CACP; 10,091 ft conc. curb; 1,045 ft2 conc. drvwy.; 48,650 ft2 conc. walks; 165 ea curb ramps; 2,035 ft2 trunc. domes; 1,840 ft2 pavers; 580 ft paint striping; 3.9 yd3 conc. in sign sup.; 3042 lb st. in sign sup.; pole found.; switch., cond., & wir.; refurb. & reinstall. extg. illum. sys.; 265 ton rk. mulch; 200 ft mtl. hdrl.; 95 ft DI pipe; 4 ea mov. extg. hydrant. Completion Time: December 31, 2022. Class of Work: Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS A 4% DBE GOAL. PROJECT MANAGER: WADE LUCKMAN, EMAIL: WADE.LUCKMAN@ODOT.OREGON.GOV 3. MULTNOMAH, CLACKAMAS & WASHINGTON COUNTIES: West Systemic Signals and Illumination (ODOT) Project on Various Highways in Portland. FAP No. SA00(196). ($2,000,000 – $5,000,000). Req. approx. 3,600 ft2 temp sign; 10 ea seq arrow sign; 5 ea PCMS; 3,400 hr flag; 12 hr flag sta light; 280 ea TCS; 145 ft PCD; 10 ea inlet protect; 14 ton contam soil disp; const surv work; 700 yd2 rem curb ramp, walk, curb, surface; 1,000 ft asph saw cut; 200 yd3 gen exc; 700 yd2 subg geotext; 800 yd2 cold plane rem; 400 ton aggr base; 100 ton aggr shoulder; 220 ton ACP (18 ton PG70-22ER); 70 yd2 conc pvmt; 640 ft curb; 290 ft2 conc island; 3,500 ft2 conc walk; 15 ea curb ramp; 180 ft2 trunc dome; 500 ft MMA striping; 1,290 ft2 pvmt bar; 88 fbm wood sign post; 12 ft sign supp drill shaft; 600 lb PSST; 110 ft2 sign; rem electrical systems; lum, lamp, ballasts; traffic signal mod; flash beacon install; 120 yd2 lawn seed; 19 yd3 topsoil. Completion Time: October 31, 2023. Class of Work: Electrical. THIS PROJECT CONTAINS A 7% DBE GOAL. PROJECT MANAGER: RICK SMITH, EMAIL: RICHARD.SMITH@ODOT.OREGON.GOV 4. MARION, LANE, LINN & BENTON COUNTIES: OR99/OR99W/OR99E Curb Ramps Project on Pacific Highway East, Pacific Highway West, and Albany-Junction City Highway (Rt. No. OR99E, OR99W, and OR99) in Harrisburg, Aurora, Monroe, and Junction City. FAP No. SA00(419). ($5,000,000 – $10,000,000). Req. approx. 1,650 hr training; 3,400 ft2 temp. signs; 6 ea. seq. arr. signs; 4,000 hr flaggers; 500 ft PCD; 20 ea. temp. curb ramp; 375 ton contam. soil disp.; const. surv. work; 10,100 yd2 rem. curb ramp, walk, curb, surf.; 12,000 ft asph. pvmt. saw cut.; 73 ea. adj. inlets; 124 ft2 prefab. mod. gravity retain. wall; 5,200 ton aggr. base; 840 ton ACP; 23,000 ft2 extra for pvmt. repair; 950 ft2 asph. slp. paving; 12,635 ft conc. curb; 4,700 ft2 conc. drvwy.; 58,000 ft2 conc. walks; 275 ea. curb ramps; 3,800 ft2 trunc. domes; 480 ft2 grouted durable rock; 6,200 ft2 pvmt. bar; 6.8 yd3 sign sup. ftgs.; 3,060 lbs PSST sign sup.; 5 ea. traffic sig. mod.; 110 yd3 topsoil; 55 yd2 bark mulch; 2,500 ft2 weed cntrl. geotext. Completion Time: December 31, 2022. Class of Work: Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS A 9% DBE GOAL. PROJECT MANAGER: BRENNAN BURBANK, EMAIL: BRENNAN.BURBANK@ODOT.OREGON.GOV 5. COOS COUNTY: OR42: Frenchie Creek Culvert Project on the Coos Bay – Roseburg Highway (Rt. No. OR42) near Remote. FAP No. S035(078). ($2,000,000 – $5,000,000). Req. approx. 450 ft2 temp. signs; 2 ea. PCMS; 200 hr flaggers; 762.5 ft temp. barr.; port. traf. sig.; const. & rem. temp. rdbd. & surf.; temp. water manage.; const. surv. work; 8,835 yd3 gen. exc.; 1,100 yd2 subg. stab.; 1,019 yd2 filter blanket; 878 yd3 riprap; 182 ft culv. pipe; 2,050 yd3 str. exc.; 53 yd3 gran. wall backfill; 56 yd3 gran. str. backfill; 172 yd3 drilled shaft conc.; 21,000 lbs drilled shaft reinf.; 235 ft drilled shaft exc.; 155 ft perm. shaft casings; 54,400 lbs reinf.; 170 yd3 found. conc.; 120 yd3 deck conc.; 155 yd3 gen. str. conc.; 294 yd2 reinf. conc. br. appr. slabs; 578 ft PCPS girders; 308.5 ft type F conc. rl.; 1,800 yd2 cold plane pvmt. rem.; 1,500 ton aggr. base; 900 ton ACP; 611 ft gd. rl.; 2,300 ft thermo. striping; 1.2 ac. seeding; 564 yd3 topsoil; streambed enhancement. Completion Time: September 15, 2023. Classes of Work: Either: A) Earthwork and Drainage, or B) Bridges and Structures. THIS PROJECT CONTAINS FUEL ESCALATION CLAUSE. THIS PROJECT CONTAINS A 3% DBE GOAL. PROJECT MANAGER: DON DUEY, EMAIL: DON.DUEY@ODOT.OREGON.GOV The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. STATE OF OREGON BY AND THROUGH ITS DEPARTMENT OF TRANSPORTATION Notice 22020 – April 7, 3 – week ad Published March 18, 2022. BT236038

ad: 236038

Publication: Construction 2

Section: Legals

Start Date: 2022/03/18

End Date: 2022/03/18

Owner: ODOT Procurement Office

City: SALEM

County: Multnomah

Bid Date: 04/07/22

Bid Time: 9:00 AM