Pursuant to Section 50.45.4

Pursuant to Section 50.45.4 of the Beaverton Development Code, public notice of the following development application is being provided: Peterkort Rock Gym (DR2022-0088 / ADJ2022-0004 / LO2022-0001) The applicant, Baysinger Partners Architecture, requests Design Review Three approval for the remodel and expansion of the existing Peterkort Towne Square shopping center anchor building that was previously occupied by Orchard Supply Hardware. Minor Adjustment approval is requested to exceed the 60-foot maximum building height standard by less than ten percent. A loading determination is requested to provide fewer loading berths than required by code. The site is located at 11120 SW Barnes Road, specifically identified as Tax Lot 1600 on Washington County Tax Assessor’s Map 1S103A. The site is zoned Corridor Commercial (CC) and is within the boundaries of the Central Beaverton NAC. Any decision on the above development proposal shall be based on the approval criteria contained in the following sections of the Beaverton Development Code: Section 40.03.1 Facilities Review, Section 40.20.15.3.C Design Review Three, Section 40.10.15.1.C Minor Adjustment, and Section 40.50.15.1.C Loading Determination. The City of Beaverton strongly encourages submitting written public testimony via email to the project planner. However, visitor comments and public hearing testimony can be provided in the following ways: –In writing via email to the project planner aharris@beaverton oregon.gov or mailboxcddplanning@beavertonoregon.gov. –In writing via mail to project planner to PO Box 4755, Beaverton, OR 97076. –Join Zoom webinar conference via phone or computer. Meeting ID and password, as well as the meeting link, can be found at https://www.beavertonoregon.gov/913/Agendas-Minutes. –If you do not have the technology to join the meeting virtually to provide testimony and you wish to do so, please contact planning staff for assistance. NOTE: The Community Development Department is currently open to the public on a limited basis, Monday through Thursday from 8:30 a.m. to 4:30 p.m. Please note that the Community Development Department is not currently open to the public on Fridays. Staff recommends visiting https://www.beavertonore gon.gov/183/Community-Development for the most up-to-date information about in-person and virtual services. Pursuant to Section 50.58 of the Beaverton Development Code, written comments or exhibits submitted prior to the hearing to be submitted by staff at the hearing must be received by the Director no later than 4:30 p.m. on the day of the scheduled hearing. Mailed written comments to the Commission should be sent to the attention of Aaron Harris, Planning Division, PO Box 4755, Beaverton, OR 97076. To be made a part of the staff report, correspondence needs to be received by October 19, 2022. All written testimony provided prior to the meeting will be provided to Planning Commission prior to their decision. Please reference the Case File Number and Project Name in your written comments. Comments may also be provided via email to aharris@beavertonoregon.gov. A copy of the pre-application conference notes, neighborhood meeting information, and all other documents and evidence submitted by or on behalf of the applicant, and applicable review criteria, are available for inspection at the Beaverton Planning Division, 4th floor, Beaverton Building, 12725 SW Millikan Way, between the hours of 8:30a.m. and 4:30p.m. Monday through Thursday except holidays. A copy of the staff report will be available for inspection at no cost at least seven (7) calendar days before the hearing. A copy of any or all materials will be provided at reasonable cost. A copy of the staff report may also be viewed online at: www.beavertonoregon.gov/DevelopmentProjects. Staff strongly encourages you to participate in the public process by reviewing documents online and viewing the public meeting at https://www.beavertonoregon.gov/913/Agendas-Minutes. If you do not have the technology to view documents, watch, or participate in the meeting, please contact the project planner for additional support. The Planning Commission hearing will be held on Wednesday October 26, 2022, at 6:30 PM, the meeting will be held remotely and can be viewed online at https://www.beaverton oregon.gov/913/Agendas-Minutes. The Planning Commission shall conduct hearings in accordance with adopted rules of procedure and shall make a decision on the development application after the hearing closes. Failure to raise an issue in a hearing, by testifying in person or by letter, or failure to provide statements or evidence with sufficient specificity to afford the decision-making authority an opportunity to respond to such issue, precludes appeal to the Land Use Board of Appeals on the issue. The Facilities Review Committee Meeting with the applicant will be held Wednesday, October 5, 2022. The Facilities Review Committee is not a decision-making body but advises the Director and Planning Commission on a project’s conformity to the technical criteria specified in Section 40.03.1 of the Beaverton Development Code. The Facilities Review Committee meeting is open to the public, but is not intended for public testimony. Accessibility information: This information can be made available in large print or audio tape upon request. Assistive listening devices, sign language interpreters, or qualified bilingual interpreters can be made available at any public meeting or program with 72 hours advance notice. To request these services, contact Aaron Harris by calling 711 503-616-8453 or email aharris@beavertonoregon.gov. Dated this September 15, 2022 Jana Fox, Current Planning Manager, City of Beaverton Publish Sept 15, 2022 TT256247

ad: 256247

Publication: OPC Legals 2

Section: Legals

Start Date: 2022/09/14

End Date: 2022/09/15

Owner: City of Beaverton / CDD

City: BEAVERTON

County: Washington