SUPPLEMENTAL NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL NOTICE TO CONTRACTORS Bids due: October 27, 2022 @ 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 27th day of October, 2022. Bid Opening will be at the Oregon Department of Transportation, 355 Capitol Street NE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to the following address: Oregon Department of Transportation Procurement Construction Contracts, MS #5-1 355 Capitol Street NE, Salem, Oregon 97301 For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project’s special provisions, and the bid booklet. The Prequalification Application form, requirements and instructions are on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx The Agency’s Electronic Bidding Information System (eBIDS) allows free access to plans, specifications, bid booklets, project addenda, and clarification letters at https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 2. COLUMBIA COUNTY: Columbia County Emergency Culvert Replacements Project on Apiary Rd and Bennet Rd near St. Helens. FAP No. C009(077). ($2,000,000 – $5,000,000). Req. approx. 420 hr training; 1,617 ft2 temp. signs; 1,300 hr flaggers; const. & rem. temp. roadbed & surf.; const. & rem. temp. access rd.; temp. water manage. facil.; 129 ton contam. soil disp.; const. surv. work; 177 yd3 ditch exc.; 921 yd3 gen. exc.; 70 yd3 stone emb.; 50 yd3 riprap; tunneling, boring, & jacking; 161 ft culv. pipe; 289 yd3 str. exc.; 83 yd3 gran. str. backfill; furn. drilling equip.; 48 yd3 drilled shaft conc.; 343 ft furn. stl. piles; 16 ea. drv. stl. piles; 356 ft preboring piles; 19,200 lbs reinf.; 113 yd3 gen. str. conc.; 163 yd2 reinf. conc. br. appr. slabs; 233 ft PCPS slabs; 135 ft type F conc. br. rl.; 31 ft PC split RCBC; 660 ft2 CIP conc. retain. wall; 2,154 yd2 cold pln. pvmt. rem.; 770 ton agg. base; 827 ton ACP; 8 ea. gd. rl. trans.; 8 ea. gd. rl. term.; 177 ft gd. rl.; 100 ft. conc. barr.; 3,904 ft striping; 2 ea. water qual. swale; water qual. filter strip; .43 ac. seeding; 18 ea. trees; 36 ea. shrubs; 300 yd3 streambed exc.; 240 yd3 salvaged streambed material; 553 yd3 engineered streambed material; 40 ea. fish rocks. Completion Time: October 12, 2023. Class of Work: Bridges and Structures. THIS PROJECT CONTAINS A 0% DBE GOAL. PROJECT MANAGER: BILL JABLONSKI, EMAIL: WILLIAM.R.JABLONSKI@ODOT.OREGON.GOV The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. Notice 22043 – October 27, 3 – week ad Published October 7, 2022 BT260337

ad: 260337

Publication: Construction 2

Section: Legals

Start Date: 2022/10/07

End Date: 2022/10/07

Owner: Oregon Department of Transportation

City: SALEM

County: Multnomah

Bid Date: 10/27/22

Bid Time: 9:00 AM