NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS Bids due: November 10, 2022 @ 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 10th day of November, 2022. Bid Opening will be at the Oregon Department of Transportation, 355 Capitol Street NE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to the following address: Oregon Department of Transportation Procurement Construction Contracts, MS #5-1 355 Capitol Street NE, Salem, Oregon 97301 — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project’s special provisions, and the bid booklet. The Prequalification Application form, requirements and instructions are on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx The Agency’s Electronic Bidding Information System (eBIDS) allows free access to plans, specifications, bid booklets, project addenda, and clarification letters at https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 1. MULTNOMAH COUNTY: I-84: I-205 – Marine Drive Section of the Columbia River Highway (Rt. No. I-205) beginning in Portland. FAP No. S002(234). ($5,000,000 – $10,000,000). Req. approx. 1,430 hr training; 3,700 ft2 temp sign; 5 ea seq arr sign; 18 ea PCMS; 4 ea spd trailer; 200 hr flag; 4 ea flag sta light; 151 ea TCS; 20,363 ea temp flex pvmt mark; 165,000 ft temp stripe; 11,600 ft stripe rem; 8 ea temp impact atten; 130 ft PCD; 480 ft2 temp walk; 352 ea inlet protec; 125 ft sed barr; 12 ton contam soil disp; const surv work; 24 ea adj inlet; 6 ea adj manhole; temp work access and contain; br rem work; 298 yd2 cl 2 prep; 900 lb reinfor; 15 yd2 conc repair; 330 yd3 PPC; 9,460 yd2 const PPC; 860 ft joint seal; 280 ft elasto conc nose; 257,700 yd2 cold plane rem; 152,000 yd2 grind conc; 210 ton aggr base; 75 ton tack coat; 24,000 ton ACP (1,500 ton PG70-22ER); 1 ea core corr; 740 yd2 ACP repair; 431 ft conc curb; 1,500 ft2 conc walk; 5 ea curb ramp; 71 ft2 trunc dome; 1,340 ft terminal joint repair; 3,400 ea pvmt mark; 24 mile rumb strip; 176,800 ft durable pvmt mark; 2,700 ft2 pvmt bar; 140 lb signal pole mount; 440 lb sign supp; 70 ft2 sign; 10 ft drill shaft; traffic signal mod; auto traffic recorder install; 2 yd3 mulch. Completion Time: November 10, 2023. Classes of Work: A) Asphalt Concrete Paving and Oiling, or B) Bridges and Structures or Miscellaneous Highway Appurtenances. THIS PROJECT CONTAINS ASPHALT AND FUEL ESCALATION CLAUSES. THIS PROJECT CONTAINS A 9% DBE GOAL. PROJECT MANAGER: AMER HMIDAN, EMAIL: AMER.HMIDAN@ODOT.OREGON.GOV The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. Notice 22044 – November 10, 4 – week ad Published October 14, 2022. BT261149

ad: 261149

Publication: Construction 2

Section: Legals

Start Date: 2022/10/14

End Date: 2022/10/14

Owner: Oregon Department of Transportation

City: SALEM

County: Multnomah

Bid Date: 11/10/22

Bid Time: 9:00 AM