NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS Bids due: February 16, 2023 @ 9:00 am Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 16th day of February, 2023. Bid Opening will be at the Oregon Department of Transportation, 355 Capitol Street NE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to the following address: Oregon Department of Transportation Procurement Construction Contracts, MS #5-1 355 Capitol Street NE, Salem, Oregon 97301 — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Closing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project’s special provisions, and the bid booklet. The Prequalification Application form, requirements and instructions are on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx The Agency’s Electronic Bidding Information System (eBIDS) allows free access to plans, specifications, bid booklets, project addenda, and clarification letters at https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflection of the Engineer’s Estimate. 2.HARNEY & MALHEUR COUNTIES: US20/OR201: Burns to Ontario Project on the US20/OR201 Highway in Burns and Ontario. FAP No. SA00(259). ($5,000,000 – $10,000,000). Req. approx. 1,550 hr training; 1,300 ft2 temp sign; 128 ft2 flashing perimeter led sign; 3 ea PCMS; 3 ea radar spd trailer; 7,500 hr flag; 3 ea flag sta light; 7 ea AFAD; 5,600 ft temp stripe; 96 ft temp trans rumble strip; 2,300 ft temp barr; 10 ea temp impact atten; temp roadbed and surface (440 yd3 gen emb; 305 yd3 gen exc; 1,050 ton aggr base; 1,400 ton ACP; 3 ton tack coat); 340 ft temp fence; 750 yd2 plastic sheet; 1 acre chem duct control; 9 ea check dam; 1,600 ft sed fence; 9,100 ft sed barr; 200 ea straw bale; 2,532 ton contam soil disp; protect/abandon monitor well; const surv work; 1,600 ft pmvt saw cut; 14,180 yd3 gen exc; 5,500 yd3 stone emb; 690 yd2 subg stabil; 16,500 yd2 drain geotext; 75 yd3 riprap; 140 ft video insp; 134 ft pipe; 140 ft paved culv end slope; 150 yd2 trench resurf; 10,210 yd2 cold plane rem; 16,800 ton aggr base; 6,520 ton ACP (281 ton PG64-28; 120 ton PG70-28ER); 5 ea asph appr; 11,000 ft2 asph walk; 7,760 yd2 conc pvmt; 3,600 ft conc curb; 250 ft2 conc island; 1,500 ft2 conc walk; 18,540 ft2 conc surface; 16 ea curb ramp; 220 ft2 trunc dome; 380 ft iso joint; 240 yd2 pvmt transition; 15 ea facility marker; 42,000 pvmt marking paint; 21,500 ft pvmt marking durable; 34 ea pvmt legend; 450 ft2 pvmt bar; 200 ft curb marking; 2 ea crosswalk closure; 2,262 fbm wood sign post; 2,518 lb sign support; 1,007 ft2 sign; traffic signal install; flashing beacon install; water quality filter strip (525 yd3 gen exc; 214 yd3 mineral aggr; 71 yd3 perlite; 712 lb dolomite; 106 lb gypsum; 278 yd3 shoulder aggr; 1,281 yd2 drain geotext; 1,281 yd2 geocell); 4 acre seed; 58 yd3 cinder mulch; 1,200 ton rock mulch; 9,300 ft2 geotext; 570 ft fence; 3 ea gate; 32 yd3 drain rock; 46 yd3 native stone. Completion Time: September 30, 2024. Classes of Work: The combination of 1) Earthwork and Drainage & 2) Portland Cement Concrete Paving. THIS PROJECT CONTAINS ASPHALT AND FUEL ESCALATION CLAUSES. THIS PROJECT CONTAINS A 5% DBE GOAL. PROJECT MANAGER: PETR LOVASIK, EMAIL: PETR.LOVASIK@ODOT.OREGON.GOV 3.JACKSON COUNTY: I-5: North Ashland – South Ashland Section of the Pacific Highway (Rt. No. I-5) in Ashland. FAP No. S001(546). ($5,000,000 – $10,000,000). Req. approx. 540 hrs train; 890 ft2 temp signs; 1 ea seq arr sign; 4 ea PCMS; 2 ea rdr spd trlr; 210,140 ft temp striping; 9,100 ft stripe rem; 0.5 acres temp mulch; 42 ea inlet prot; const surv wrk; 500 ft asph pvmt saw cut; 275 yd3 exc; 175 yd2 geot; 88 ft CIPP liner; 351 ft vid insp; 211 ft pipe; 2 ea sl end sect; 64 ft2 paved end sl; 1,313 yd2 br appr CPPR; 51,445 ft2 conc & crk seal; 0.9 yd3 elas conc nos mat; 180 ft rep elas conc nos; 389 ft jt seal; 364,800 yd2 CPPR; 6,300 ton aggr base; 160 ton emuls asph; 53,000 ton ACP (3,200 ton PG 76-22ER asph); 4 ea core corr; 11,540 ft crk seal; 600 yd2 ACP rep; 3 ea asph appr; 912.5 ft gd rl; 851 ea delin; 27 mi rumb strips; 17,200 ft thermos striping; 195,000 ft striping tape; 1.7 yd3 conc in sign sup; 250 lb st in sign sup; 3 ea elec sys install; tele comm mat; tele comm install; tele comm spl & test; 0.5 acre seeding. Completion Time: October 26, 2023. Classes of Work: Asphalt Concrete Paving and Oiling. This project contains asphalt and fuel escalation clauses. THIS PROJECT CONTAINS A 7% DBE GOAL. PROJECT MANAGER: TIMOTHY FLETCHER, EMAIL: TIMOTHY.W.FLETCHER@ODOT.OREGON.GOV The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. Notice 23006 – February 16, 4 – week ad Published January 20, 2023 BT270836

ad: 270836

Publication: Construction 2

Section: Legals

Start Date: 2023/01/20

End Date: 2023/01/20

Owner: Oregon Department of Transportation

City: SALEM

County: Multnomah

Bid Date: 02/16/23

Bid Time: 9:00 AM