NOTICE TO CONTRACTORS

STATE OF OREGON DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS Bids due: May 23, 2024 @ 9:00 AM Bid Closing for the projects identified below will be at 9:00:00 a.m. on the 23rd day of May, 2024. Bid Opening will be at the Oregon Department of Transportation, 355 Capitol Street NE, Salem, Oregon, beginning at 9:00:00 a.m. on the day of Bid Closing. Bids will be received by Marie Wright, Construction Contracts Manager. — Submit electronic bids, on-line, through Bid Express (www.bidx.com) before 9:00:00 a.m. on the day of Bid Closing. Submit paper bids to Marie Wright, Construction Contracts Manager: — Before 9:00:00 a.m. on the day of Bid Closing. — For Bids submitted by mail or parcel delivery service, send to the following address: Oregon Department of Transportation Procurement Construction Contracts, MS #33 355 Capitol Street NE, Salem, Oregon 97301 — For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 Bids, Bid modifications, and Bid withdrawals will not be accepted at or after 9:00:00 a.m. on the day of Bid Clos-ing. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT’s Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project’s special provisions, and the bid booklet. The Prequalification Application form, requirements and instructions are on the Agency’s website http://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspx The Agency’s Electronic Bidding Information System (eBIDS) allows free access to plans, specifications, bid booklets, project addenda, and clarification letters at https://ecmnet.odot.state.or.us/ebidse Preliminary bid results are published on the following websites by close of business on Bid Closing day http://www.oregon.gov/ODOT/Business/Procurement/Pages/PBR.aspx, http://www.bidx.com Award of contracts will not be final until: 1) Three working days after Notice of Intent to Award is posted on the Agency’s website or 2) The Agency provides a written response to each timely protest, denying the protest and affirming the award; whichever is later. All projects include a steel escalation clause. All projects have minimum wage rate requirements. Wage publications are published on the Agency’s website at http://www.oregon.gov/ODOT/Business/Pages/Project-Wages.aspx All projects require work to be performed by the Contractor’s own organization of at least 30 percent of the awarded contract amount. All federally funded projects have BUY AMERICA requirements. Email the Project Manager listed at the end of each announcement for PROJECT SPECIFIC TECHNICAL QUESTIONS. The project cost range value is preliminary, may not reflect the current scope of the project, and is not a reflec-tion of the Engineer’s Estimate. 1. MARION COUNTY: I-5: Kuebler Blvd. to Delaney Road Widening Section of the Pacific Highway (Rt. No. I-5) in Salem. FAP No. S001(505). (Over $30,000,000). Req. approx. 4,405 ft2 temp. signs; 3 ea seq. arr. signs; 10 ea PCMS; 2 ea rdr. sp. trlr.; 800 hrs flag.; 4 ea flag. sta. light.; 450 ea TCS; 120 hrs pil. cars; 40,126 ft temp. striping; 27,158 ft temp. barr.; 11 ea temp. imp. atten.; temp. illum.; 12 ea wk. zone pres. light. sys.; 2 ea furn. smart wk. zone sys.; 600 day smart wk. zone sys.; const. & rem. temp. rdbd. & surf.; temp. drain. fac.; temp. wtr. mgmt. fac.; 50 day bypass pump mon.; 17 acre temp. mulch.; 22,860 yd2 mat.; 10,870 yd2 comp. eros. blnkt.; 229 ea ch. dam; 16 ea const. entr.; 200 ft sed. fence; 156 ea inlet prot.; 6,026 ft sed. barr.; 10 ea temp. ener. diss.; turb. mon.; 480 ton contam. soil disp.; segr. & stkpl. contam. soil; 120 ft rem. asb.; 1,120 ft2 rem. asb.; const. surv. wk.; 34,000 ft asph. pvmt. saw cut.; 92,5655 yd3 exc.; 5,170 yd3 st. emb.; 1,500 yd3 sel. gran. bkfl. mtrl.; 24,700 yd2 subg. stab.; 59,700 yd2 geot.; 3,970 yd2 geogrid; 152 yd3 riprap; 25 ea riprap bas.; 1,400 yd3 rk. inlay exc.; 15,000 ft vid. inspect.; 3,917 ft dr. pipe; 300 ft culv. pipe; 10,317 ft st. swr. pipe; 22 ea sl. end sect.; 720 ft2 pav. culv. end sl.; 63 ea conc. M.H.; 67 ea conc. inlet; 188 ft drain. curbs; br. rem. wk.; 1,450 yd3 gran. str. bkfl; furn. pile dr. equip.; 3,706 ft furn. st. piles; 44 ea dr. st. piles; 8 ea pile ld. test; 166,300 lb. reinf.; 372 yd3 dk. conc.; 554 yd3 str. conc.; 1,553 yd2 saw cut text.; 452 yd2 conc. br. appr. slab; 1,073 ft PC prestr. slabs; 229 ft conc. rail; 8,626 yd2 arch. trtmt.; 23,682 ft2 retain. wall; 2,834 ft prot. fence; 1,139 ft PC prestr. gird.; 370 ft jt. seal; 367 ft conc. parapet; 327 ft orn. prot. screen.; 323 yd3 str. exc.; 1,207 ft predrill. & encas. sold. piles; 1,120 ft st. sold. piles; 3,551 ft2 lag.; wall drain. & fltr. sys.; 55,626 ft2 sound wall; 1,408 yd2 br. CPPR: 141 ft elas. conc. nos.; 7,350 ft2 poly. memb.; 130,010 CPPR; 42,300 ton aggr. base; 37 ton emuls. asph. in fog ct.; 95 ton emuls. asph. for tk. ct.; 53,060 ton ACP (1,460 ton PG 64-22; 1,860 ton PG 70-22ER); 7 ea core corr.; 6 ea asph. appr.; 5,783 ft conc. curbs; 8,600 ft2 conc. walks; 10 ea curb ramps; 96 ft2 trunc. domes; 44 ft valley gtr.; 4,688 ft gd. rl.; 9,409 ft conc. barr.; 1,158 ft rem. & reinstall. extg. conc. barr.; 9 mile rmbl. strips; 9,210 ft MMA striping; 92,730 ft thermo. striping; 330 fbm wd. sign post; 9.69 yd3 conc. in sign sup.; 89 ft sign sup. drill. shft. found.; 36,621 lb st. in sign sup.; 1,038 ft2 signs; cam. poles & found.; pole found.; lumin., lamps, & ball.; switch., cond., & wir.; light. poles & arms; 1 ea elec. sys. install.; ITS elec. sys. install.; telecom. install.; 1 ea stor. pond; 6 ea bioret. pond; 1 ea wtr. qual. swale; 22 acre weed ctrl.; 29 acre seeding; 22 acre fert.; 359 yd3 topsoil; 24 ea trees; 1,777 ea plant; 153 ea vines; 64 yd3 bk. mulch; 1,984 ft fence; 1 ea wtr. qual. plntr. Completion Time: March 4, 2027. Classes of Work: A) Bridges and Structures, or B) Earthwork and Drainage. THIS PROJECT CONTAINS AS-PHALT AND FUEL ESCALATION CLAUSES. THIS PROJECT REQUIRES AN ASBESTOS ABATEMENT LI-CENSE AS REQUIRED BY ORS 468A.720. THIS PROJECT CONTAINS A 12% DBE GOAL. THIS PROJECT CONTAINS A 3% INDIAN EMPLOYMENT PREFERENCE GOAL. PROJECT MANAGER: ANDREW WALKER, EMAIL: ANDREW.J.WALKER@ODOT.OREGON.GOV The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. Notice 23064 – May 23, 5 – week ad Published April 19, 2024. BT322832

ad: 322832

Publication: Construction 2

Section: Legals

Start Date: 2024/04/19

End Date: 2024/04/19

Owner: Oregon Department of Transportation

City: SALEM

County: Multnomah

Bid Date: 05/23/24

Bid Time: 9:00 AM